BUILDING POWERFUL CONNECTIONS SINCE 1964

Description

Rural Electric constructed power distribution and control systems for the operation of 8 large flow control gates at the Drop 2 Reservoir System. Project elements included two 84″ time transit flow meters, gate controls, trash rake controls, canal flow monitoring, reservoir level monitoring, power distribution and standby power systems.

OWNER: Bureau of Reclamation

GENERAL CONTRACTOR: Ames Construction

LOCATION: El Centro, CA

YEAR COMPLETED: 2010

MARKET: Industrial

SCOPES OF WORK:

  • Dry Utilities
  • Fiber Optics
  • Lightning Protection

Relevant Projects

  • Sheppard AFB T-38 Shades
  • Tres Rios Environmental Restoration
    Tres Rios Environmental Restoration
  • Asarco Ray A-1 Acid Storage Tanks
  • Asarco Ray Mine Storage Building