BUILDING POWERFUL CONNECTIONS SINCE 1964

Description

Under a tight schedule when there could be zero downtime on the airfield lighting systems, Rural Electric was able to completely renovate the airfield lighting control systems, airfield lighting power regulators, and upgrade the electrical distribution systems on two independent airfield lighting vaults. Each vault required a cut over to a temporary vault (Designed and built by Rural Electric) and upon completion of the retrofit, was cut back over to the new vault system. All systems were a go for each vault, all deadlines were met and the travelling public, pilots and ATC did not see a hiccup.

OWNER: City of Phoenix

GENERAL CONTRACTOR: CS&W Contractors

LOCATION: Phoenix, AZ

COMPLETION: 2013

MARKET: Transportation

SCOPE OF WORK: 

  • Aviation Lighting Control
  • Dry Utilities
  • Fiber Optics
  • Lightning Protection
  • Medium Voltage

Relevant Projects

  • Lubbock Localizer & Grounding
    Lubbock Airport - RW 8/26 Reconstruction
  • March ARB
    March ARB - Airfield Reconstruction
  • Phoenix Sky Harbor Airport Sky Train - Phase 1A
  • San Bernardino International Airport
    San Bernardino International Airport
  • San Bernardino
    San Bernardino International Airport - Upgrade ALCMS
  • Phoenix Sky Harbor RSA Modifications RW 26L
    Phoenix Sky Harbor - RSA Modifications RW 26L