A very tight deadline and two complete lighting vault retrofits required the design and construction of a temporary airfield lighting vault for Phoenix Sky Harbor Airport. The project was designed, procured and fabricated in 35 days in order to be ready for a December 2012 shut down of the North Vault. Fabrication of a stacked constant current regulator array (14 regulators) within a 45′ dry van semi trailer required steel racking, 480V and 120V distribution systems, Mechanical AC systems and innovative field connection methods.

GENERAL CONTRACTOR: CS&W Contractors

LOCATION: Phoenix, AZ

YEAR COMPLETED: 2013

SCOPE OF WORK:

  • Aviation Lighting Control

Relevant Projects

  • March ARB
    March ARB - Airfield Reconstruction
  • Phoenix Sky Harbor Airport Sky Train - Phase 1A
  • Columbus Indiana Airfield
    Columbus Indiana Airfield Lighting Control System
  • March Air Reserve Base Airfield
    March Air Reserve Base Airfield Lighting Control System
  • Palm Springs International Airfield
    Palm Springs International Airfield Lighting Control System
  • San Bernardino
    San Bernardino International Airport - Upgrade ALCMS
  • Waco Airport Airfield
    Waco Airport Airfield Lighting Control System
  • Phx Sky Harbor Airport Lighting Control
    Phoenix Sky Harbor - Airport Lighting Control System Installation