BUILDING POWERFUL CONNECTIONS SINCE 1964

Description

Rural Electric’s work on this project included regulating & overbank wetlands. In addition, installing a new power distribution system and a control and monitoring system for an effluent treatment area.

OWNER: City of Phoenix

GENERAL CONTRACTOR: Archer Western

LOCATION: Tolleson, AZ

MARKET: Industrial

SCOPE OF WORK:

  • Dry Utilities
  • Fiber Optics
  • Lightning Protection

Relevant Projects

  • Drop 2 Storage Reservoir Canal & Structures
    Drop 2 Storage Reservoir Canal & Structures
  • Sheppard AFB T-38 Shades
  • Asarco Ray A-1 Acid Storage Tanks
  • Asarco Ray Mine Storage Building
  • Phoenix APS
    Phoenix - APS Meter Vault Diversion Structure
  • City of Phoenix Booster Station
    City of Phoenix Booster Station 2A-B12
  • FMI - Bagdad SX/EW Power & Control Upgrade
  • Farmington Pump Stations Block 9 Stage 2